SPIRAL 2 Commissioning Status  
 
  • J.-M. Lagniel
    GANIL, Caen, France
 
  The first phase of the SPIRAL 2 project dealing with the high-power superconducting linac and the two experimental areas called Neutron for Science (NfS) and Super Separator Spectrometer (S3) is well advanced. The project has entered in a phase during which the linac components are successively installed and commissioned (the first beam was produced in December 2014). After having briefly recalled the project scope and parameters, the way the accelerator installation and commissioning are done is presented.  