MOAM6P —  Plenary5   (04-Jul-16   11:30—12:00)
Chair: W.-T. Weng, BNL, Upton, Long Island, New York, USA
Paper Title Page
MOAM6P60 Recent Progress of J-PARC MR Beam Commissioning and Operation 1
 
  • S. Igarashi
    KEK, Ibaraki, Japan
 
  The main ring (MR) of the Japan Proton Accelerator Research Complex (J-PARC) has been providing 30-GeV proton beams for elementary particle and nuclear physics experiments since 2009. The beam power of 390 kW has been recently achieved with 2·1014 protons per pulse and the cycle time of 2.48 s for the neutrino oscillation experiment. Main efforts in the beam tuning are to minimize beam losses and to localize the losses at the collimator section. Recent improvements include the 2nd harmonic rf operation to reduce the space charge effect with a larger bunching factor and corrections of resonances near the operation setting of the betatron tune. Because the beam bunches were longer with the 2nd harmonic rf operation, the injection kicker system was improved to accommodate the long bunches. We plan to achieve the target beam power of 750 kW in 2018 by making the cycle time faster to 1.3 s with new power supplies of main magnets, rf upgrade and improvement of injection and extraction devices. The possibility of the beam power beyond 750 kW is being explored with new settings of the betatron tune.  
slides icon Slides MOAM6P60 [9.973 MB]