TUAM4Y —  Parallel Session   (05-Jul-16   10:15—10:40)
Chair: A.M. Lombardi, CERN, Geneva, Switzerland
Paper Title Page
TUAM4Y01
Instability Investigation of the China ADS Injector-I Testing Facility  
 
  • F. Yan, H. Geng, C. Meng, Y.L. Zhao
    IHEP, Beijing, People's Republic of China
 
  The instablility of the China ADS SC section of the injector-I testing facility is investigated. The performance of the beam footprinted at different positions of the instability chart are studies using program and compared with experiment results. A moderate design was chosen to avoid envelope resonances or equipartitioning between different freedom of planes. The longitudinal acceptance is determined by the stabilization of the cavity phase and amplitude. The details will be reported in this presentation.  
slides icon Slides TUAM4Y01 [3.190 MB]