TUPM1Y —  Parallel Session   (05-Jul-16   14:00—14:25)
Chair: F.G. Garcia, Fermilab, Batavia, Illinois, USA
Paper Title Page
TUPM1Y01 Advances in the Development of the ESS-Bilbao Proton Injector 1
 
  • Z. Izaola, I. Bustinduy, J. Corres, G. Harper, R. Miracoli, J.L. Muñoz, I. Rueda, A. Vizcaino, A. Zugazaga, D. de Cos, C. de la Cruz
    ESS Bilbao, Zamudio, Spain
 
  We present the last advances in the operation and construction of the ESS-Bilbao 3 MeV proton beam injector. The proton ECR source allows to change the distance between the plasma chamber and the first extraction electrode, acceleration gap. The beam has been characterised at different acceleration gaps by current transformers, wire scanners and photographs of 2d profiles. In addition, we present the status of the construction of the RFQ; which is at its beginning.  
slides icon Slides TUPM1Y01 [11.758 MB]