TUPM4Y —  Parallel Session   (05-Jul-16   15:15—15:40)
Chair: F.G. Garcia, Fermilab, Batavia, Illinois, USA
Paper Title Page
TUPM4Y01 IFMIF-EVEDA RFQ, Measurement of Beam Input Conditions and Preparation to Beam Commissioning 1
 
  • M. Comunian, L. Bellan, E. Fagotti, A. Pisent
    INFN/LNL, Legnaro (PD), Italy
  • L. Bellan
    Univ. degli Studi di Padova, Padova, Italy
 
  The commissioning phase of the IFMIF-EVEDA RFQ requires a complete beam characterization with simulations and measurements of the beam input from the IFMIF-EVEDA ion source and LEBT, in order to reach the RFQ input beam parameters. In this article the simulations of source LEBT RFQ will be reported with the corresponding set of measurements done on the Ion source and LEBT.  
slides icon Slides TUPM4Y01 [7.235 MB]